Remodeled great room under a wood plank ceiling
Whole-home remodels · North Knoxville

Keep the address.
Rebuild the house.

For homes with good bones and tired everything else. We open the walls, fix what we find and bring every room up to one standard, with a fixed price before demolition starts.

Start the questionnaireCall Micah · (865) 213-7870
Step 2 of 6 Whole-home remodel selected · Next: size, location, design, investment, contact
Project questionnaire
When was it built?
About a minute. Micah calls you within one business day.
Tap one to continue
Built for this market

The north side was built in the ’70s, ’80s and ’90s.

Those houses are now 25 to 55 years old. The framing is often sound. The wiring, windows and floor plans are decades out of date. That's the work a whole-home remodel does.

By the numbers

Owner-occupied homes built between 1970 and 1999

5,192Homes in Fountain City
4,031Homes in Powell
3,243Homes in Halls
2,173Homes in Corryton

Source: U.S. Census Bureau, American Community Survey. Counts by ZIP code.

Why big remodels go sideways

Most remodel budgets break behind the walls.

In Houzz's own survey of remodeling homeowners, only 36 percent finished on budget. The reasons repeat: problems found after demolition, bids that left things out, and decisions made halfway through the job.

i.

What's behind the walls

Old wiring, notched joists, a wall that turns out to carry the roof.

Micah reads a house the way an architect reads a structure. Before you sign, he tells you which walls can move, which can't, and what tends to hide in a house that age.

ii.

Bids you can't compare

One contractor includes windows and the next one doesn't.

Our price is line by line, with every finish named, so you know exactly what you're buying.

iii.

Decisions on the fly

Picking tile while the crew waits is how change orders pile up.

Every selection gets made and priced before demolition starts.

iv.

The job that drags

Remodels get dragged on with missed deadlines and schedules.

Your project features a real-time schedule, keeping you updated every step of the way, holding everybody accountable.

Project questionnaire
Tell us about your remodel in six questions.
Start the questionnaireCall Micah
What's included

One project. Every room.

Every house is different. We scope yours at the first walk-through. We offer expert guidance through the pre-design phase of your remodel.

Layout and structure

Walls opened or moved, beams added, rooms reworked to fit how you live now.

Kitchen and baths

Planned together so the whole house reads as one.

Systems

Electrical, plumbing and HVAC brought up to current code while the walls are open.

Windows and doors

Larger openings and more light.

Floors, ceilings and trim

One finish standard from the front door to the primary suite.

Exterior

Roofline, siding and entry updated so the outside matches the inside.

Remodeled living room under a wood plank ceiling
From the portfolio
Warm Contemporary
See this home
Questions

Before you start.

Should we remodel, or tear down and rebuild?

Sometimes a rebuild costs less than a remodel that touches every system. Micah will tell you which makes more sense for your house at the first walk-through.

Can we live in the house during the remodel?

It depends on the scope. Projects that take out the kitchen and baths usually mean moving out for part of the job. Micah lays out the phases at the walk-through so you can plan.

How long does it take?

Your project features a real-time schedule, keeping you updated every step of the way.

Project questionnaire

Tell us about your house.

Start the questionnaireSend a noteCall Micah
mcombs@knoxvillecustomhomes.us